PHASE 3C
Phase 3C of the US 95 Northwest Corridor Improvement Project is the second of three projects that will provide local connections and create a system-to-system interchange at US 95 and CC 215, also known as the Centennial Bowl. The first project of Phase 3 was completed in summer 2017, and the final project will begin once funding is identified.
NEWS & EVENTS
Temporary Lane Reductions on 215 Beltway near US 95 interchange 5/2/2021 Long-term Closure of Oso Blanca 02/05/2021 The Centennial Bowl’s Final Phase Breaks Ground in Northwest Las Vegas 1/11/2021 View the Centennial Bowl project site from above. View Ramp Openings Second longest bridge in Nevada opens! 9/13/2020 SB US 95 Ramp at Oso Blanca/215 Beltway intersection Closure 9/23/2019 Centennial Center Blvd Lane Closures 2/27/2019 Centennial Bowl Public information Meeting materialsTimelapse Video - June 2020