Project Materials
Environmental Documents
Final Environmental Impact Report (November 2024)
The final EIR was released on Nov. 15, 2024, and describes the proposed Project, evaluates the potential environmental impacts associated with both the Project and the "no project" alternative, contains responses to the comments received during the public comment period, and documents the Findings. The final EIR will be presented at the CCJPA Board Meeting on Nov. 20, 2024, where the CCJPA Board of Directors will be asked to certify the final EIR and approve the Project to proceed to the next phase.
- Final Environmental Impact Report
-
Appendices
- Appendix A — DEIR Public Outreach Summary Report
- Appendix B — Mitigation, Monitoring and Reporting Program
- Appendix C — CEQA Comment Letters
- Appendix D — Comment Letters from Recurring Letter #1
- Appendix E — Comment Letters from Recurring Letter #2
- Appendix F — Comment Letters from Recurring Letter #3
- Appendix G — Non-CEQA Comment Letters (Section 4.2)
- Appendix H — Fremont Public Petition as Copied from Internet
- Appendix I — Supplemental Cumulative Analysis
- Appendix J — Full Draft Environmental Impact Report
Draft Environmental Impact Report
- Title Page and Table of Contents
- Executive Summary
- 1 - Introduction
- 2 - Project Alternatives
-
3 - Existing Conditions, Environmental Impacts, and
Mitigation Measures
Individual Resource Sections for Chapter 3:- 3.1 Introduction
- 3.2 Aesthetics
- 3.3 Agriculture and Forestry
- 3.4 Air Quality
- 3.5 Biological Resources
- 3.6 Cultural Resources
- 3.7 Energy
- 3.8 Geology, Soils, and Paleontological Resources
- 3.9 Greenhouse Gas Emissions
- 3.10 Hazards and Hazardous Materials
- 3.11 Hydrology and Water Quality
- 3.12 Land Use Planning
- 3.13 Mineral Resources
- 3.14 Noise and Vibration
- 3.15 Population and Housing
- 3.16 Public Services
- 3.17 Recreation
- 3.18 Transportation
- 3.19 Tribal Cultural Resources
- 3.20 Utilities and Service Systems
- 3.21 Wildfire
- 4 - Sea Level Rise
- 5 - Other CEQA Considerations
- 6 - Public Outreach and Agency Consultation
- 7 - List of Preparers
- 8 - References
- Full Draft Environmental Impact Report
- Appendix A - Alternative E (Proposed Project) and Other Project Alternatives
- Appendix B - Air Quality
- Appendix C - Biological Resources
- Appendix D - Cultural Resources
- Appendix E - Hazards and Hazardous Materials
- Appendix F - Hydrology and Water Quality
- Appendix G - Noise and Vibration
- Appendix H - Public Services and Transportation Analysis
- Appendix I - Cumulative Utilities Analysis
- Appendix J - Sea Level Rise
- Appendix K - Other CEQA Considerations_Environmental Justice Impacts
- Appendix L - Scoping-Outreach-Agency Consultation
Public Scoping Period (June 2020)
Collateral Toolkit
Background Reports
- Capitol Corridor South Bay Connect Project Definition Report (2019)
- Capitol Corridor South Bay Connect Project Definition Appendices (2019)
- California State Rail Plan (2018)
- Capitol Corridor Vision Implementation Plan (2016)
- The Northern California Megaregion (2016)
- Capitol Corridor Vision Plan Update Final Report (2014)
Archived Fact Sheets
- Project Summary
- Project Benefits
- Integrated Rail Strategy
- Freight Rail Information
- Freight Rail vs. Passenger Rail
- Ardenwood Station
- SR-84 Intermodal Bus Facility